Hot dipped galvanized steel solar panel strut channel is a core support component designed specifically for photovoltaic systems. The U-shaped groove structure provides excellent bending strength (tensile strength ≥ 160MPa) and surface treatment (thickness ≥ 12 μm). It is suitable for installation on roofs (metal/tile surfaces), floors, and carports. The pre-punched design is compatible with mainstream fixtures and supports horizontal/vertical layout.
Material
Galvanized Steel
Grade
Q235, etc.
Size
40*30mm (Width x Height)
Wall Thickness
1.5-2.5mm
Surface Treatment
Hot Dipped Galvanized
Service Life
Over 25 years
Length
4M or 1-6M custom
Load-bearing
≤ 180kg (spacing ≤ 1.5m)
Waterproof
IP67
Wind Resistance
≤ 60m/s
Product Advantages:
Factory direct supply: Cost is 15% - 30% lower than similar products.
Universal compatibility: Compatible with 90% of mainstream fixtures.
Super weather resistance: Passed 4800 hours of salt spray testing.
Fast delivery cycle: High daily production capacity ensures 3-7 days global shipment.
Do you need special tools to install solar panel strut channel?
Only standard wrenches and cutting tools (such as tungsten steel saws) are needed. Installation guides and video tutorials can be provided.
Can it be adapted to clay tile roofs?
Yes, special hooks (such as Tile Roof Hooks) are required, with a load of ≤ 18kg/m² and a spacing of ≤ 0.6 meters.
How to deal with extreme low temperature (-40 ºC) environment?
6063-T5 aluminum alloy and specific galvanized steel grades have excellent low-temperature toughness and can pass the -40 ºC impact test (IEC 61215 standard).
Does it support LOGO or color customization?
We support laser engraving of logos and customized black anodizing (standard MOQ applies).
What is the ultraviolet resistance of the system?
The system features an Ultraviolet Reflectance of ≥85%, ensuring durability under intense sunlight exposure.
What is the typical delivery timeframe?
Standard inventory products can be delivered within 3-7 days. Customized solutions typically take 15-45 days depending on specification.